high-tech › Specialty Equipment Installation

General Electric Aircraft

Albuquerque, NM

Description:

Engine Manufacturing Facility

Size:

746,000 square feet

Owner:

General Electric Aircraft

Services Provided:

General Contractor: Equipment Installations, Sustaining Maintenance, Structural Steel, Concrete 
Metal Building Erection

Over a span of 20 years Klinger provided a variety of construction and maintenance services throughout the plant.  The facility manufactures composite assemblies as well as machined metal components. Klinger placed structural and equipment foundations, erected structural steel, upgraded the metal roofing and provided interior architectural spaces. Our equipment setting included five axis Omni-mills, presses and calibration tables.  In addition we upgraded 140 bridge cranes and hoists.  This effort included designing and implementing a crane maintenance system.